Scope : to assure underground pipe and structure on protected condition as per accepted requirement on NACE RP 0169 and 0176
Client Supervisor: Andi Soegiarto
Required SOP, WI, anda form:
– SOP soil to reffcell potential measurement
– SOP current intruption
– etc
Tool :
– Current Interepter
– Reff cell Cu/CuSO4
– Reff cell AG/AgCL
– High impedance multimeter
Material :
– Mg anode
– Royston handycap
– HDPE cable
– Junction box
Facebook Comments