Skip to content
  • Home
News:
Portofolio Work Experienced
Concrete steel reinforcement corrosion survey on PT Badak LNG Bontang Plant
Installation ICCP for underground pipe from Babat to Gresik plant

Mukhlis Adam, ST., MT.

Material, corrosion & welding engineering – Program Studi Sarjana Terapan Teknik Las, Jurusan Teknik Bangunan Kapal, Politeknik Perkapalan Negeri Surabaya. E-mail : mukhlis.adam@ppns.ac.id https://www.linkedin.com/in/mukhlis-adam-aa37a329

  • Home
  • Home
  • 2022
  • January
  • 14

Day: January 14, 2022

Jan 14

Installation ICCP for underground pipe from Babat to Gresik plant

mukhlisadamLeave a commentPengalaman Kerja Industri

SCope : to install ICCP as per NACE RP 0169

Jan 14

Refurbish ICCP System underground pipe PT IPMOMI PAITON

mukhlisadamLeave a commentPengalaman Kerja Industri

Scope : to assure underground pipe and structure on protected condition as per accepted requirement on NACE RP 0169 and 0176 Client Supervisor: Andi Soegiarto Required SOP, WI, anda form: – SOP soil to reffcell potential measurement – SOP current Read more

Categories

  • Budaya
  • Engineering
  • Kegiatan Pengabdian Kepada Masyarakat
  • Kesehatan
  • Nasehat ulama
  • Pelatihan
  • Penelitian
  • Pengajaran
  • Pengalaman Kerja Industri
  • Penulisan karya ilmiah
  • Tugas Akhir Mahasiswa

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
January 2022
M T W T F S S
« Apr    
 12
3456789
10111213141516
17181920212223
24252627282930
31  
Copyright © All rights reserved.
University Hub by WEN Themes